Installation Guide
Every Docklife floating dock is delivered and installed by our own professional crew. Here is what happens during a typical installation.
2-4 Hours
Typical install time
Full Crew
We bring all equipment
Fully Installed
Delivery and install included
What Our Crew Brings
Step-by-Step Instructions
Unpack & Inspect
15 minUnpack all dock cubes and hardware. Inspect for any shipping damage and verify you have all components listed on your packing slip.
Connect Cubes on Land
30-60 minOur crew lays out your dock cubes in the desired configuration on flat ground and uses the interlocking pin system to connect all cubes together.
Install Trex Decking (If Included)
30-60 minIf your dock includes Trex composite decking, our crew installs the grooved decking panels with hidden fasteners over pressure-treated framing on top of the connected cubes.
Launch & Position
15-30 minWith help, slide or carry the assembled dock into the water. Use a kayak, small boat, or rope to position it where you want it.
Anchor & Secure
30 minSecure your dock using anchor lines, pilings, or our gangway system depending on your waterfront setup.
Need Help With Installation?
Our team is here to help. We offer professional installation in Florida or can guide you through the process over the phone.